Standard Configuration 11: Steady-state solution for off-design case.
Contour plots of flow Mach number for the off-design test case of Standard
Configuration 11.
Note that the flow has separated at the leading edge on the suction surface.
The flow re-attaches at approximately 30 percent chord.